top of page

Dynamic Framer Stud Placement Construction Tool

Dynamic Framer Stud Placement Construction Tool

Dynamic Framer

Worked with Dynamic Framer to bring their early prototype to being mass production ready. The new tool is a wall stud alignment and placement kit for fast and safety code qualified wall frames.

Dynamic Framer Stud Placement Construction Tool

Development Steps Used

Techniques & Tools Used

  1. Discuss products intedned functions

  2. Evaluate functionality of initial prototype

  3. Redisign prototype

  4. In house testing

  5. Finalize design

  • Idea generation

  • Prototype evaluation

  • Design CAD from protoype

  • Redisign within CAD

  • 3D printing prototype

  • Testing for alignment and function

  • Creating CAD blueprints

Development Gallery

Final Product Outputs

Functional and showcase ready prototype was handed over along with 3D modled CAD designs and 2D CAD files. The 2D CAD files include manufacturing readyprototype blueprints as well as part lists and bill of materials. A recamendation for a suitable manufacturing company was provided as well.

Time to Completion

200

Number of CAD Iterations

6

Number of Prototype Iterations

5

bottom of page